Man Cave Update

Finally finished some bits in the Man Cave this weekend. Installed the uPVC windows (which have 60mm spacers round the edges due to the shutters. Surprisingly easy once I’d been given a few pointers on what fixings to use by a friend.

2014-02-08 20.15.02

2014-02-08 20.40.08

As you can see, hanging down here is also the first of 2 hoists that will be in the roof. I finished welding & spraying the frame today, and popped it all together 🙂

2014-02-08 20.39.05

Posted in The Man Cave


Leave a Reply


Powered by WordPress. Designed by Försäkra Online.