The Man Cave

So my new Man Cave has been acquired. Many will recall the pictures of my Cellar in Bristol, but the move has meant my Cave has been upgraded to a Double Garage 🙂

Here are the “before” pics 🙂

IMG_5424 2013-09-03 18.54.38 IMG_5430 IMG_5427 IMG_5422

And here are some “during” photos, at this stage we’ve moved in, and the ceiling & roof are done. I’ve not yet started the electrics yet.

2013-12-16 19.29.40 2013-12-16 19.29.49 2013-12-16 19.29.58 2013-12-16 19.30.34 2013-12-16 19.30.39 2014-01-08 20.43.53

And a further set of images for the next stages:

2014-01-09 18.13.47 (Medium) 2014-01-09 18.13.52 (Medium) 2014-01-09 18.14.00 (Medium) 2014-01-09 18.14.36 (Medium) 2014-01-09 18.14.42 (Medium) 2014-01-09 18.15.05 (Medium)

So we’ve got the majority of electricals in (the new feed from the house won’t happen for a few months, so feeding from the old fuse box atm on a proper mcb, exterior lighting is up, as is interior lighting, and the racking is all pretty much in place. I have some more plans for racking, the windows need installing and hatches in the roof also need installing, but waiting on the builder to come back for that.

Posted in CCTV, Landie, LEGO, Personal, Proper Tools, The Man Cave